Seeley G. Mudd Lab 447 Lehigh University Main Campus

Construction Value:
$250,000
Client:
Lehigh University
Architect:
NALLS Architecture

This complete renovation and upgrade of a 2,500 SF teaching laboratory in an occupied building was a fast-tracked project that required rigid dust containment measures. The scope involved new hooding and ventilation systems, chemical resistant countertops and floor coverings, custom casework, acoustical ceilings, installation of specialty gases, and centralized vacuum and compressed air lines. Significant MEP alterations and upgrades were also included.